Im still trying to work out what i want before I start building. I'm thinking about building a full extension bottom drawer for the sump. Unions on all hard plumbing and valves. I've been looking at return line manifolds and like the simplicity of one pump. Anyone have posivive or negative experience with a return system and manifolds?
Thinking about cutting the 5 gallon tank to the right to a 2.5 gallon ATO tank. Using an aqualifter controlled the aqualifter to supply a kalk reactor for my ato. Coming off the return i have room for at least a 3 valve manifold to supply reactors Any thoughts are truly appreciated.
It's been a slow process but I'm making progress. Plumbing is almost finished. The left side will consist of shelfs and controllers. Next will be wire management for the probes and pumps. The sump is setting in a water tight shelf on stainless ball bearing slides. Will be able to disconnect the plumbing with unions and slide the sump out for maintaince